Karnataka Power Corporation Ltd Is Looking For Assistant Engineers Last Date 18-08-2017

About Karnataka Power Corporation Ltd:  

The gears of enterprise in Karnataka powered nascent industrial activity as early as the year 1800, when the first sugar unit was set up. In 1902, Karnataka recorded another “mega watt sized project” – Asia’s first Hydro Electric Power Station in Shivanasamudram, on the banks of river Cauvery.

In fact, Karnataka’s pioneering spirit in the field of power has been translated into several major milestones. Karnataka was the first to embark on Alternating current, when Bengaluru City’s lighting scheme was completed.
 
Karnataka had the longest transmission line in the world in 1902, from Shivanasamudram to KGF, covering a distance of 147 km. and it was the first state in the country to conceive and set up a professionally managed Corporation to plan, construct, operate and maintain power generation projects in the state. That’s the legacy that KPCL started with and built on.
###

Vacancy Details: 

 
Post Name: Assistant Engineers
No of Posts: 140
 
 
Age Limit: 40 Years
 
 
Pay scale : 19055-43995 Per Month 
  
Educational Qualification:
 
Candidates Should have A degree or equivalent qualification in related Discipline from a recognized University.
 
Important Dates:
 
Last Date –   18-08-2017
 
How to Apply:
 
Applications to this job are to be filled online. Please follow the link is given below to apply ( or visit original job details page): http://karnatakapower.com/ENGG_RECRUITMENT_2017.ASP
 
 
###
Receive All Updates Via Facebook